Marathon Digital Mines Invalid Bitcoin Block, Blames Bug Amid Community Concerns

Source: AdobeStock / Photocreo BednarekBitcoin miner Marathon Digital confirmed it mined an invalid block due to a bug during an experiment to sharpen the company’s operations

The firm disclosed the incident in an announcement on X (formerly Twitter) saying the firm utilizes a small portion of the hash rate to experiment in the developmental pool to improve its overall mining capacity

According to several reports, it mined the invalid Bitcoin (BTC) block at height 809478 citing a bug in its environment.

The error was the result of an unanticipated bug that came from one of our experiments.”

The firm explained that the error that was discovered was not connected to the Bitcoin Core or Marathon Digital production pool adding that Bitcoin functioned properly.

This incident, while unintended, underscores the robust security of the Bitcoin network, which rejected and rectified the anomaly.”

Community raises concerns

On Wednesday, Bitcoin developer 0xB10C revealed that Marapool was faced with an issue due to wrong spending outputs confirmed by other developers

Within hours, community members flagged the incident with some calling for wider investigations although the miner explained that the experiment was in no way intended to alter Bitcoin’s core.

Similarly, BTC devs like “mononaut” said the mistake came from relying on ascending absolute fees to sort transactions while analyst Dylan LeClair noted that this sort of experiment should have been carried out on a testnet before a subsequent deployment on Bitcoin’s mainnet.

Jameson Lopp the co-founder of CasaHodl highlighted the events as proof of Bitcoin’s strength

Bitcoin is an impenetrable fortress of validation. No double spending allowed!”

The company’s share price was down 2.94% in the last 24 hours

Marathon to increase capacity

Marathon Digital has revealed plans for its mining arm to improve capacity relying on efficiency while it expands its operations

This year the company reported a 134% year-on-year increase in its mining capacity and was able to shrink its net losses in the last quarter while improving revenues compared to last year occasioned by market downturn and stifling regulations.

In May, the company announced an increase in hash rate by 22% to 14 EH/s and installed rates by 16% to 17.9 EH/s. It also increased its unrestricted BTC holdings to 11568 BTC

Furthermore, the company has pushed its plans for an expansion to the Middle East in a partnership with Zero Two billed to optimize two mining sites in Abu Dhabi with a combined capacity of 250 megawatts

The company plans this amid miner's woes, increased BTC hashrate, and an upcoming BTC halving which is approximately 205 days away

此頁面可能包含第三方內容,僅供參考(非陳述或保證),不應被視為 Gate 認可其觀點表述,也不得被視為財務或專業建議。詳見聲明
  • 讚賞
  • 留言
  • 轉發
  • 分享
留言
0/400
暫無留言
交易,隨時隨地
qrCode
掃碼下載 Gate App
社群列表
繁體中文
  • 简体中文
  • English
  • Tiếng Việt
  • 繁體中文
  • Español
  • Русский
  • Français (Afrique)
  • Português (Portugal)
  • Bahasa Indonesia
  • 日本語
  • بالعربية
  • Українська
  • Português (Brasil)